Puglia and Regulations of the town of Nardo
House Plan Puglia Regional
in the new category, update on the house plan of your region!
Within 90 days of the new rules approved by the regions, which during the confrontation with the government defended its legislative competence in matters of housing and urban planning. Will be simultaneously launched policies to combat work and to the revival of social housing. The regions can also use the most revenue derived from VAT on real estate operations for support for rent-sustainable. With
regional laws are regulated volume increases of 20% on existing buildings and those of up to 35% in the case of demolishing and rebuilding using the standards of green building and energy conservation.
The increases, never more than 200 square meters, will be carried out on single and two-family residential buildings not exceeding one thousand cubic meters, subject to various regional arrangements. Excluding any derogation from the sale of urban planning and space requirements, which according to the assumptions made above, would allow increases of up to 40% on existing buildings. (Read more about www.architetturafacile.com )
House Plan Regulation of the town of Nardo
Regulation prepared by the city contains both the list of areas not suitable for the ability to carry out interventions is a series of recommendations for the correct application of legge.In particular interventions can not be achieved within the areas "A" of the PRG, the fortified farms, construction and repair rural villas and residences of recognized historical value and witnesses, although not specifically bound by law, and general construction of more than 100 anni.Il Regulation also governs how to calculate the percentage of enlargement on buildings in whole or in part on buildings and squatters who legitimately made under the law of the PRG may develop further the volume residuo.Per extensions are allowed to derogate from the maximum heights provided by PRG up to a further plan, excluding areas under landscape obligations, provided that on the top floor will not be carried further volumes emerging, including technical facilities. In any case, the enlargement of the existing residential unit must be equipped with windows with glazing cavity with air or gas.Anche interventions demolizione‐ricostruzione devono rispettare le distanze minime e gli altri parametri edilizi previsti dal PRG. E’ consentito di derogare alle altezze massime limitatamente ad un ulteriore piano, con esclusione delle zone sottoposte a vincolo paesaggistico, a condizione che sull'ultimo piano non siano realizzati ulteriori volumi emergenti, compresi i vani tecnici.In deroga ai divieti di cui all'art. 6, comma 1, lettere e) e g) della legge, al fine di conseguire un miglioramento ambientale attraverso il recupero del patrimonio edilizio degradato, i benefici della legge sono estesi:• agli ambiti “B” del PUTT/p non ricadenti in zona paesaggistica;• agli ambiti costieri ricadenti nel Piano di Recupero degli insediamenti abusivi – zone omogenee B26 del PRG.Sono inoltre ammissibili in zona paesaggistica, con le medesime finalità di miglioramento ambientale :• gli interventi di ristrutturazione per i quali gli ampliamenti delle superfici utili abitative previsti dalla legge siano realizzabili esclusivamente mediante trasformazione di volumi con destinazione non residenziale legittimamente esistenti;• i soli interventi di cui all'art. 3 della legge, se eseguiti su edifici di recente costruzione in contrasto con le qualità ambientali dei luoghi, legittimamente esistenti alla data di entrata in vigore del PRG e che da tale data non abbiano subito ampliamenti.Gli interventi sono soggetti al reperimento e cessione gratuita al Comune delle aree a standard in misura corrispondente volumetric increase previsto.Solo in case of unavailability, it shall be monetizzazione.Per extensions must be found space for car parks at a minimum of 1 cubic meter of volume mq/10 made; if it is shown the impossibility of finding the above surface parking, the requirement can be met either by payment to the municipality a sum equal to the cost base of construction per square meter of space for parking reperire.Per from the demolition and reconstruction with an increase in the volume referred to ' art. 4 of the Act must be found in the parking mq/10 said measure at least 1 cubic meter of construction for the entire volume of the building to be implemented, unless the major allocations for public parking demands of the PRG. Compensation is not permitted in listed denaro.Sono Finally, the annexes to Dia. (Read all about http://www.pianocasa2009.com)
>>> Back to the home page of SIS Property and Tourism>>>
Saturday, March 13, 2010
Thursday, January 28, 2010
Kates Playground 2099
real estate market and the profession need clear regulatory
"The market and the professional real estate agent they need, increasingly, for certain rules. " Training, new services and greater professionalism in the protection of citizens that were at the center of arguments between Fiaip - Italian Federation real estate agents and adhering to Confedilizia Confindustria - and Tecnoborsa - the consortium of Italian Chambers of Commerce for the development of real estate.
meeting was attended, for the Fiaip, the National President Paul Righi and Vice-President and Deputy National Franco D'Onofrio, for Tecnoborsa, President Ramon Soria, Vice President and General Manager Giampiero Bambury Ettore Troiani.
During the meeting, the lines were drawn for the development of new cooperation projects between Fiaip Tecnoborsa and directed, first, to increase potential customers and to make them recognizable to the professional real estate agent qualified, aimed, on the other hand, the implementation of upgrade paths / Higher Education (accessible in the university) as a strategic approach to help achieve a high quality of professional performance, comparable with the standard condition was europei.Nella also spoke of the need to maintain the role of estate agents as currently in force at the Chambers of Commerce, as an instrument of certain minimum requirements of the prerogatives and functions that the estate agent must ensure that the primary interest of the citizen-consumer.
Raymond Soria, during his meeting with Fiaip, argued the importance Strategic same association in the body of the chamber system, as well as illustrating a first draft programmatic joint activities involving Tecnoborsa also as a scientific partner in the Observatory on the Parliamentary Estate Market.
"The profession has certain rules need to be able to ensure high professional standards, as happens in the major EU countries - said the National President Paul Righi Fiaip - and a possible distortion of the current rules governing the profession of estate agent could undermine the citizen-consumers and irreparable damage to the market. E 'for these reasons that Fiaip is fighting in defense of the role of agents of Brokerage kept by the Chamber of Commerce. Fiaip Tecnoborsa and will work for the joint development of minimum standards of services. " In expressing the further growth of the Company Righi Chamber President has also expressed its best wishes for the work to the President Soria. The President
Tecnoborsa Raymond Soria, has agreed to turn the hope, hoping for increased cooperation between the two bodies and said: "It is the certainty of the rules that define the characteristics and professional training and constant updating of Realtors you play the quality of services offered to the public, confidence in the market and the future of the profession "
Source: press office FIAIP
Back to Homepage http://www.studioimmobiliarespano.it
"The market and the professional real estate agent they need, increasingly, for certain rules. " Training, new services and greater professionalism in the protection of citizens that were at the center of arguments between Fiaip - Italian Federation real estate agents and adhering to Confedilizia Confindustria - and Tecnoborsa - the consortium of Italian Chambers of Commerce for the development of real estate.
meeting was attended, for the Fiaip, the National President Paul Righi and Vice-President and Deputy National Franco D'Onofrio, for Tecnoborsa, President Ramon Soria, Vice President and General Manager Giampiero Bambury Ettore Troiani.
During the meeting, the lines were drawn for the development of new cooperation projects between Fiaip Tecnoborsa and directed, first, to increase potential customers and to make them recognizable to the professional real estate agent qualified, aimed, on the other hand, the implementation of upgrade paths / Higher Education (accessible in the university) as a strategic approach to help achieve a high quality of professional performance, comparable with the standard condition was europei.Nella also spoke of the need to maintain the role of estate agents as currently in force at the Chambers of Commerce, as an instrument of certain minimum requirements of the prerogatives and functions that the estate agent must ensure that the primary interest of the citizen-consumer.
Raymond Soria, during his meeting with Fiaip, argued the importance Strategic same association in the body of the chamber system, as well as illustrating a first draft programmatic joint activities involving Tecnoborsa also as a scientific partner in the Observatory on the Parliamentary Estate Market.
"The profession has certain rules need to be able to ensure high professional standards, as happens in the major EU countries - said the National President Paul Righi Fiaip - and a possible distortion of the current rules governing the profession of estate agent could undermine the citizen-consumers and irreparable damage to the market. E 'for these reasons that Fiaip is fighting in defense of the role of agents of Brokerage kept by the Chamber of Commerce. Fiaip Tecnoborsa and will work for the joint development of minimum standards of services. " In expressing the further growth of the Company Righi Chamber President has also expressed its best wishes for the work to the President Soria. The President
Tecnoborsa Raymond Soria, has agreed to turn the hope, hoping for increased cooperation between the two bodies and said: "It is the certainty of the rules that define the characteristics and professional training and constant updating of Realtors you play the quality of services offered to the public, confidence in the market and the future of the profession "
Source: press office FIAIP
Back to Homepage http://www.studioimmobiliarespano.it
Saturday, January 16, 2010
South Parkon Streaming English
Puglia, presented the Landscape Plan Regional Spatial
shared rules of transformation of the territory to develop the identity and The commissioner
values \u200b\u200bin regional Puglia Region, Angela Barbanente, presented the Regional Territorial Landscape Plan (PPTR) suitable for a code of cultural heritage and landscape and in line with the European Landscape Convention.
With the approval in the Committee, opened the consultation of the socio-institutional partnerships for knowledge sharing and Plan of part of the regional community (complete with the materials at www.paesaggio.regione.puglia.it).
"I am delighted - said Barbanente - the approval was not easy given that plans like this can not be dropped from above but must share with the territory and citizens who care about their care. The plan is ready and suitable for the Environmental Assessment Act provides for public consultation. "
This step is in line with the path of concerted and participatory process that marked the floor: in fact, the development was carried out in consultation with the Ministries of Heritage and Culture and Environment and was accompanied by as many as eight conferences of programmatic area divided into two cycles: the first between December 2008 and May 2009 (Altamura, Vernon, Lucera, Grottaglie), the second in July 2009 (in Monte Sant ' Angelo Nardo, Bari, Mesa), which was attended by over 1,500 people. To these we must also add numerous other initiatives to discuss the plan at the initiative of local authorities, professional bodies and associations. In the formation of the Plan were also involved fifty bodies in memoranda of understanding aimed at the development of Integrated Projects experimental landscape (see 4.3 of the cards in the elaborate PPTR).
Plan, before its approval, is generating some significant cultural and design effects, consistent with the approach, which is not only vincolistico but aspires to encourage the regional community to rethink itself and to anchor the innovation to socio-economic and cultural values \u200b\u200bof their heritage landscape. In the proposal of the Plan, in fact, the Apulian landscape products in time along the history of those who inhabited them, and that inhabit them, are the heritage on which to build a lasting and sustainable future of the region not only in terms of environmental, territorial and urban, but also in terms of social, economic and cultural. The primary objective of the plan is to build shared rules of transformation del territorio che consentano di mantenerne e svilupparne l’identità e i valori e di elevarne la qualità ecologica e insediativa, per migliorane la vivibilità e l’attrattività.
Il PPTR è stato elaborato sulla nuova Carta Tecnica Regionale in scala 1:5.000, integrata nel Sistema Informativo Territoriale (SIT), che consente di disporre per la prima volta in Puglia di una cartografia in formato digitale accurata e aggiornata e di una serie di servizi per il governo del territorio rivolti ad enti e singoli operatori e cittadini. Le conoscenze sulla struttura idro-geo-morfologica sono state condivise con l’Autorità di Bacino della Puglia che ha elaborato la “Carta Idrogeomorfologica”, e quelle relative alla man-made structure and cultural history were discussed with the Regional Directorate of Cultural Heritage and Activities and the four public universities that have contributed to the elaboration of Puglia the "Charter of Cultural Heritage". The new Plan will therefore be a major step forward compared to PUTT, to finally return consistency, certainty and transparency to the system of landscape protection in the region. In the transition from plan to plan, adopted October 20, 2009 in accordance with the procedures laid down by Law No 20/2009, the proposed plan approved yesterday by the Government have been completed all the processing required to achieve the specific agreement with the Ministry of the landscape assets of state jurisdiction e per garantire le forme di consultazione caratterizzate da ampia pubblicità e partecipazione sociale previste dalle norme sulla Valutazione Ambientale Strategica.
fonte: http://www.pianocasa2009.com/piano_casa_puglia.html
>>>torna all home page di studioimmobiliarespano.it
shared rules of transformation of the territory to develop the identity and The commissioner
values \u200b\u200bin regional Puglia Region, Angela Barbanente, presented the Regional Territorial Landscape Plan (PPTR) suitable for a code of cultural heritage and landscape and in line with the European Landscape Convention.
With the approval in the Committee, opened the consultation of the socio-institutional partnerships for knowledge sharing and Plan of part of the regional community (complete with the materials at www.paesaggio.regione.puglia.it).
"I am delighted - said Barbanente - the approval was not easy given that plans like this can not be dropped from above but must share with the territory and citizens who care about their care. The plan is ready and suitable for the Environmental Assessment Act provides for public consultation. "
This step is in line with the path of concerted and participatory process that marked the floor: in fact, the development was carried out in consultation with the Ministries of Heritage and Culture and Environment and was accompanied by as many as eight conferences of programmatic area divided into two cycles: the first between December 2008 and May 2009 (Altamura, Vernon, Lucera, Grottaglie), the second in July 2009 (in Monte Sant ' Angelo Nardo, Bari, Mesa), which was attended by over 1,500 people. To these we must also add numerous other initiatives to discuss the plan at the initiative of local authorities, professional bodies and associations. In the formation of the Plan were also involved fifty bodies in memoranda of understanding aimed at the development of Integrated Projects experimental landscape (see 4.3 of the cards in the elaborate PPTR).
Plan, before its approval, is generating some significant cultural and design effects, consistent with the approach, which is not only vincolistico but aspires to encourage the regional community to rethink itself and to anchor the innovation to socio-economic and cultural values \u200b\u200bof their heritage landscape. In the proposal of the Plan, in fact, the Apulian landscape products in time along the history of those who inhabited them, and that inhabit them, are the heritage on which to build a lasting and sustainable future of the region not only in terms of environmental, territorial and urban, but also in terms of social, economic and cultural. The primary objective of the plan is to build shared rules of transformation del territorio che consentano di mantenerne e svilupparne l’identità e i valori e di elevarne la qualità ecologica e insediativa, per migliorane la vivibilità e l’attrattività.
Il PPTR è stato elaborato sulla nuova Carta Tecnica Regionale in scala 1:5.000, integrata nel Sistema Informativo Territoriale (SIT), che consente di disporre per la prima volta in Puglia di una cartografia in formato digitale accurata e aggiornata e di una serie di servizi per il governo del territorio rivolti ad enti e singoli operatori e cittadini. Le conoscenze sulla struttura idro-geo-morfologica sono state condivise con l’Autorità di Bacino della Puglia che ha elaborato la “Carta Idrogeomorfologica”, e quelle relative alla man-made structure and cultural history were discussed with the Regional Directorate of Cultural Heritage and Activities and the four public universities that have contributed to the elaboration of Puglia the "Charter of Cultural Heritage". The new Plan will therefore be a major step forward compared to PUTT, to finally return consistency, certainty and transparency to the system of landscape protection in the region. In the transition from plan to plan, adopted October 20, 2009 in accordance with the procedures laid down by Law No 20/2009, the proposed plan approved yesterday by the Government have been completed all the processing required to achieve the specific agreement with the Ministry of the landscape assets of state jurisdiction e per garantire le forme di consultazione caratterizzate da ampia pubblicità e partecipazione sociale previste dalle norme sulla Valutazione Ambientale Strategica.
fonte: http://www.pianocasa2009.com/piano_casa_puglia.html
>>>torna all home page di studioimmobiliarespano.it
Subscribe to:
Posts (Atom)